Permanent Lighting Estimator

Job

Prints on the order sheet header

Footage

$44 / ft · all stories
320 total lighting ft
Installed lighting$14,080
Jumper wire 3 ft of wire = 1 ft of lighting
Power plan: 1 control box + 1 booster — one control box per job, then one booster every 200 ft of load past the first 200. Jumper wire counts toward the load.

Power & control

Auto-filled from the load

Labor add-ons

$250 each

Existing lighting

Priced per foot, separate from the run

Zones

First 2 included · $500 each after
Total zones on the job 2 included · 0 billable

Build spec

Checked off on the order sheet
Track color
Wire color
Mounting location
Substrate

Notes / additional work

Free text on the order sheet
ORDER SHEET
Lighting by LeafFilter®order sheet
Customer
City
Job #
State

Track Color:

Mounting Location:

Substrate:

Accessories:

Wire Color:

Highlight zone

Drag to draw the roofline. Pick a zone to draw that run in its own color, or use Highlight a line to colour a line you already drew — tap it again with the same zone to take it back off. The key under the drawing fills in as you go. Tap a symbol, then tap the drawing to place it; erase removes whatever you tap.

Whole house drawing
S – Soffit mount F – Fascia mount C – Controller box (estimated location) ⚡ – Add electrical outlet (if required)

Footage:

1st story:
2nd story:
3rd story:
Total lighting:
Jumper wire:

Pro Tip:

  • Control box can handle 300 lights.
  • Every 3 feet of jumper reduces the control box power by one light.
  • Max 225 feet without additional power supply.

Notes/additional work:

# Electrical outlets:

Work order: LeafFilter will install roofline lighting in specified areas, including necessary wiring. Installation covers controller setup, track with LEDs, and system requirements as needed (see above). The system is UL-certified, IP68 waterproof, and Dark Sky compliant. LeafFilter is not liable for pre-existing electrical issues, structural defects, or post-installation modifications. Controller box and wiring locations determined as needed.

Customer acceptance of drawing and work order:
Date: